The short answer

San Diego Community Power's Solar Battery Savings program pays an upfront rebate based on your battery's usable capacity — $350 per kWh for a new solar-plus-battery system and $250 per kWh for adding a battery to existing solar, with higher rates for CARE, FERA and Community of Concern customers — plus $0.10 per kWh when the battery discharges during weekday peak events. On a 13.5 kWh battery, the upfront rebate is roughly $4,725 at the market rate. You must be an SDCP residential customer, own a single-family home, and charge the battery from solar rather than the grid.

  • Upfront rebate: $350/kWh for new solar plus battery, $250/kWh for a battery retrofit; income-qualified and Community of Concern customers get $500 and $350 respectively
  • The performance incentive is $0.10 per kWh for discharging 50% of usable capacity on weekday peak events — real, but modest next to the upfront rebate
  • Eligibility is geographic: SDCP serves San Diego, Chula Vista, Encinitas, La Mesa, National City, Imperial Beach and unincorporated county areas
  • The battery must charge from your solar panels, not from the grid — which rules out battery-only installations
  • Tesla, Enphase, FranklinWH and SolarEdge batteries appear on the program's eligible equipment list

Most battery incentives in California are hard to pin down. San Diego Community Power's Solar Battery Savings program is unusually specific: published rates per kilowatt-hour, a defined dispatch window, and a named list of eligible equipment. It is also one of the few programs where the money is meaningful enough to change a homeowner's decision. This guide covers what the program pays, the eligibility rules that catch people out, how it interacts with California's SGIP rebate and with net billing, and the honest arithmetic on the performance incentive — because two of the highest-ranking pages on this topic publish annual figures that differ by a factor of two. San Diego Solar installs across San Diego County, and every battery brand on the program's list is one we work with.

*Program terms, rates and budgets are set by San Diego Community Power and change between fiscal years. Confirm current rates and availability with the program before you sign anything.*

<!-- REGISTRY NOTE for PM: sdcommunitypower.org is the primary source for every figure in this post and is not yet in content/_link-registry.md, so it is named in prose only. Adding it (and cal-cca.org) to the registry would let this post cite its main authority directly. -->

What this guide covers

  • What the Solar Battery Savings program actually is
  • What it pays upfront, by customer type
  • How the performance incentive works, and what it is really worth
  • Who qualifies, and the rules that disqualify people
  • Which batteries are eligible
  • How it fits with SGIP and net billing
  • The catches worth knowing before you enrol
  • What it does not do

What is the Solar Battery Savings program?

It is a rebate and demand-response program run by San Diego Community Power, the community choice aggregator that now supplies electricity to most of the region. SDCP buys the power; SDG&E still owns the poles, wires and meter and still sends the bill.

The program pays homeowners to install battery storage and then to discharge it during the late-afternoon peak, which is when the grid is most strained and power is most expensive. SDCP committed nearly $55 million over five years to it, with $18.8 million allocated for the fiscal year that began 1 July 2025, and enrolment for the full program opened at the end of September 2025. It follows a 2024 pilot that drew more than 1,600 participants and put more than 2,200 batteries on local roofs and garage walls.

Why it exists is worth understanding, because it explains the design. Every battery that discharges at 6 p.m. instead of drawing from the grid reduces the amount of expensive peak power SDCP has to buy. The program is not charity — it is cheaper for SDCP to pay you than to buy that power on the market. That alignment is why the dispatch requirement is a condition of the incentive rather than an option.

How much does the program pay upfront?

The upfront rebate is calculated per kilowatt-hour of usable battery capacity, and the rate depends on whether you are adding solar too and whether you qualify for the non-market rate.

Your situationStandard rateCARE / FERA / Community of Concern
New solar and battery$350 per kWh$500 per kWh
Adding a battery to existing solar$250 per kWh$350 per kWh

Run those rates against real battery sizes:

  • One 13.5 kWh battery, new solar-plus-storage system — about $4,725 at the standard rate, about $6,750 at the non-market rate
  • One 13.5 kWh battery added to existing solar — about $3,375 standard, about $4,725 non-market
  • Two 13.5 kWh batteries with new solar — about $9,450 standard

Against an installed battery cost of $12,000–$16,000 per unit, a rebate in the $3,375–$6,750 range per battery is a substantial share of the price. It is currently the largest storage-specific incentive available to most San Diego homeowners, and unlike the federal residential tax credit — which ended on 31 December 2025 — it is a direct rebate rather than something you claim on a return.

The non-market rate applies to customers enrolled in CARE or FERA, or living in a designated Community of Concern. If you are on CARE or FERA, that is a $150 per kWh difference, which on two batteries is more than $4,000. It is worth checking your enrolment status before you price a system rather than after.

What is the performance incentive actually worth?

$0.10 per kWh discharged during weekday peak events — which is real money, but far smaller than the upfront rebate, and this is where a lot of published content overstates things.

The mechanism: on qualifying weekdays, the program calls a dispatch event inside the 4 p.m. to 9 p.m. window (the exact hours shift by month) and you are expected to discharge at least 50% of your battery's usable capacity. You earn $0.10 for each kilowatt-hour discharged.

Do the arithmetic on a 13.5 kWh battery:

  • 50% of 13.5 kWh is 6.75 kWh per event
  • 6.75 kWh × $0.10 = about 68 cents per event
  • Across roughly 250 weekdays a year, that is on the order of $170 a year

That is worth having, and over the life of the battery it adds up — but it is not the reason to enrol. The upfront rebate is roughly 25 to 40 times larger. If you have read a figure closer to $350 a year, that comes from assuming more throughput per event; published estimates on this vary by a factor of two, which is a good reason to treat the performance incentive as a bonus rather than as a line in your payback calculation.

There is also a performance obligation attached: the program expects your enrolled capacity to actually be available, with monthly performance measured against what you enrolled. A battery you keep reserved at 100% for outage backup cannot simultaneously be discharging 50% every weekday. That trade-off is the single most important thing to think through before enrolling, and we cover the reserve-level decision on our battery storage page.

Who qualifies for the Solar Battery Savings program?

Four conditions, and the first one is geographic — which is where most people fall out.

1. You must be a San Diego Community Power residential customer. SDCP supplies San Diego, Chula Vista, Encinitas, La Mesa, National City, Imperial Beach and unincorporated communities of San Diego County. If you live in Carlsbad, Oceanside, Poway, Escondido, Vista, San Marcos, Santee, El Cajon or Del Mar, you are not an SDCP customer and this program does not apply to you — check which supplier is named on your bill rather than assuming. We install across every part of San Diego County, and the incentive landscape genuinely differs from one city to the next.

2. It must be a single-family home at the service address, and you need to own it.

3. The battery must charge from your solar panels, not from the grid. This is the rule people miss. A battery-only installation does not qualify. If you do not already have solar, the program pays the higher $350 per kWh rate precisely because it wants the solar installed alongside — which is why pairing panels and storage in one project is both cheaper to build and better rewarded.

4. You cannot already be enrolled in a conflicting demand-response program. Participation in the Emergency Load Reduction Program or the Demand Side Grid Support program rules you out, since you cannot sell the same flexibility twice.

For readers in the SDCP cities, the practical filter is simple: own a single-family home, have or be getting solar, and have your battery on the eligible list. Homeowners in Chula Vista and the other member cities are in the strongest position in the county on storage incentives right now.

Which batteries are eligible?

The program maintains a qualified product list, and the manufacturers on it are Enphase, FranklinWH, SolarEdge and Tesla.

That covers the three battery platforms we most often install:

  • Tesla Powerwall — 13.5 kWh usable, one large block, strong continuous output
  • Enphase IQ — modular, built up from smaller blocks, so you can match enrolled capacity more precisely
  • FranklinWH — 13.6 kWh usable, effectively the same capacity class as the Powerwall

One consequence of a per-kWh rebate worth noting: the rebate scales with usable capacity, so the incentive rewards capacity rather than power output. A modular system lets you tune enrolled capacity to what you can genuinely commit to discharging; a single large block gives you more rebate but a bigger dispatch obligation. Neither is universally better — it depends on whether you are optimising for backup or for incentive income.

Confirm the current qualified product list with the program before ordering equipment, since lists get revised between fiscal years.

How does it stack with SGIP and net billing?

This is the part neither of the top-ranking pages on this topic addresses, and it is where the real value sits.

Net billing is why the program pays at all. Since 15 April 2023, new California solar customers have taken service on the net billing tariff. Under the CPUC's net-billing rules, electricity you export is credited at its value to the grid rather than at retail — locally around $0.05 per kWh exported against roughly $0.40 per kWh for peak power you buy back between 4 and 9 p.m. A battery that shifts your own production into that window is already avoiding the expensive side of an eight-to-one spread. The SDCP performance incentive is paid on top of a saving you were making anyway, which is the correct way to think about it.

SGIP is a separate program with a separate administrator. California's Self-Generation Incentive Program is overseen by the CPUC through California's SGIP program and administered in SDG&E territory by the Center for Sustainable Energy. It has its own budget categories, its own equity and resiliency tiers, and its own conditions — including enrolment in a qualified demand-response program. Whether SGIP and the SDCP rebate can be claimed on the same battery is a question to put to both programs directly before you plan around it; the answer depends on current program rules rather than on anything a contractor can promise.

The federal credit is not part of this picture. The Section 25D residential clean energy credit terminated on 31 December 2025 under the One Big Beautiful Bill Act, with no step-down, and the IRS has confirmed it cannot be claimed for property placed in service after that date. Any calculator that adds 30% federal to these rebates is wrong.

What are the catches?

Five, and none of them are dealbreakers — but they should be priced in.

  • The budget is finite and annual. SDCP runs a 1 July to 30 June fiscal year with an allocation per year. A program with published rates and a fixed budget is a queue, and queues close.
  • There is a multi-year commitment. Leaving the program early can mean repaying part of the upfront rebate, so read the term and the clawback provisions before signing.
  • Backup reserve competes with dispatch. Capacity you hold back for outages is capacity you are not discharging for the incentive. Decide which job the battery is primarily doing.
  • Rates change between fiscal years. The figures above are current as published; treat them as a snapshot, not a guarantee.
  • The permit ceiling caps how far you can scale. In the City of San Diego, the no-plan-review path published by the City's solar permit program allows storage up to 38.4 kWh total with no single unit over 20 kWh, alongside 38.4 kW AC of generation and a 320-amp service upgrade. Two 13.5 kWh batteries (27 kWh) fit comfortably; three (40.5 kWh) exceed the ceiling and drop the project into full plan review.

Once you know those, the useful next step is a design that matches enrolled capacity to what your household can actually discharge each weekday — not the biggest battery someone can sell you. Send us twelve months of usage and we will return a written proposal within 48 hours, sized to your actual load and to the eligible equipment list. Request a free solar quote or call San Diego Solar at (619) 514-0095.

Frequently asked questions

How much can I get from the SDCP Solar Battery Savings program?

The upfront rebate is $350 per kWh of usable capacity for a new solar-plus-battery system and $250 per kWh for adding a battery to existing solar, rising to $500 and $350 for CARE, FERA and Community of Concern customers. On a 13.5 kWh battery that is roughly $3,375 to $6,750 depending on your situation, plus $0.10 per kWh on peak discharges.

Can I get the rebate for a battery without solar panels?

No. The program requires the battery to charge from your solar panels rather than from the grid, so a battery-only installation does not qualify. If you do not have solar yet, the new-system rate is the higher of the two.

Does the program work if I have SDG&E instead of San Diego Community Power?

The program is for SDCP customers, and SDCP supplies San Diego, Chula Vista, Encinitas, La Mesa, National City, Imperial Beach and unincorporated county communities. SDG&E still delivers the electricity and issues the bill for SDCP customers, so check the supply section of your bill to see which applies to you.

Will enrolling stop my battery from backing up my house during an outage?

No, but it competes for capacity. The program expects you to discharge at least half your usable capacity on weekday peak events, so a battery kept at a high reserve for outage protection will underperform its enrolled capacity. Sizing two units instead of one is the usual way to serve both goals.

Can I combine this with California's SGIP rebate?

That depends on current program rules for both, and it is worth confirming directly with SDCP and with the SGIP administrator rather than assuming. Both programs carry demand-response conditions, and those conditions are where conflicts typically arise.

What happens if I sell my house during the program term?

Read the transfer and clawback provisions in your enrolment agreement before you list. Programs like this generally contemplate transfer to a new owner, but the obligation and the timing of any repayment are set by the agreement rather than by custom.

Two things decide what this program is worth to you, and you can check both this week: which supplier is named on the supply section of your electricity bill, and whether you are enrolled in CARE or FERA. The first decides whether you qualify at all; the second is worth $150 per kWh.

Get your free quote

Ready to Go Solar?

Get a free, personalized solar quote for your San Diego home in under 2 minutes.

Get Your Free Quote