Skip to content
Clairemont, San Diego, CA

Roofing + Solar in
Clairemont, CA

Clairemont went up fast — seven homes a day in the early 1950s. Seventy years on, the question is how many roofs are stacked on yours. Deck, roof and array assessed by one company, CSLB #970079, since 1996.

30 Years Serving SD
100% In-House Crews
Save 30–40% Prepaid Lease
CSLB Lic #970079
5-Star Reviews
The short answer

Is Clairemont a good place to re-roof and go solar together?

Yes, once we know what's under the top layer. San Diego Solar installs roofing and solar together across all five Clairemont neighbourhoods on one licence — CSLB #970079 (C-39, C-10, C-46) — with in-house crews and 30 years in the county. Most homes here date from the early 1950s and have been re-covered once or twice, which decides overlay versus tear-off. A free roof-and-energy assessment settles it.

By the numbers

Roofing + solar in Clairemont, at a glance

0

Clairemont Neighbourhoods Served

0

Ft Mesa Height Limit

0

Yr Roof Workmanship Warranty

0

Yr Solar Production Guarantee

Savings figures are estimates based on SDG&E rates and typical household usage. Actual savings vary by system size, roof, energy use, and future utility rate changes.

What’s different here

What’s special about roofing in Clairemont?

Roof stock, permitting, and weather exposure differ street to street across San Diego County — and they decide both the right roofing material and the right solar mounting. Here’s how we approach Clairemont specifically.

Layer Count Comes First

California code allows a new covering over one existing layer only where it's sound and dry. A 1952 house has usually been re-covered at least twice, so a full tear-off is the code path, not an upsell. We confirm layer count and deck condition first, then quote.

The Low-Slope Sections Decide the Project

Tavares and Burgener laid Clairemont out with winding streets and view lots over the canyons above Mission Bay rather than a grid, and the era's flat and low-slope sections — carports, additions, rear extensions, plenty still on tar and gravel — are where the real work sits. A welded membrane there gives the array a clean, watertight mounting plane.

The Mesa Has Its Own Thirty-Foot Ceiling

Clairemont sits under the Clairemont Mesa Height Limit Overlay Zone in chapter 13, article 2, division 13 of the San Diego Municipal Code, which caps most structures at 30 feet. Added roof build-up plus array height is checked against that before drawings go to City of San Diego Development Services, so plan check is not where the problem surfaces.

The Electrical Half Is In-House Too

A 1950s house often has a 1950s main panel, and the C-10 electrical classification on our licence sits alongside the roofing and solar ones. Deck, roof, panel and array are all assessed and handled by one company with one combined warranty rather than three trades booked around each other over a summer.

Real numbers

How much does a new roof with solar cost in Clairemont?

Clairemont's modest footprints keep most projects in the lower half of the $30,000–$60,000 roof-and-solar range, and one contractor saves 15–20% versus hiring separately. Flat sections are common: 1,500 sq ft runs $7,000–$12,000 for modified bitumen, up to $21,000 for PVC. Aged gravel is a tear-off.

Modified bitumen

$7K–$12K

Value choice, welded seams

Typical installed range

$7,000–$12,000

TPOMOST COMMON

$10K–$18K

Most popular under solar

Typical installed range

$10,000–$18,000

PVC

$12K–$21K

Longest life, coastal-resistant

Typical installed range

$12,000–$21,000

Ranges are for a 1,500 sq ft low-slope area. A combined roof-and-solar project runs $30,000–$60,000 before incentives — about 15–20% under hiring a roofing company and a solar company separately. The prepaid lease takes a further 30–40% off the solar portion.

The five steps

How does a combined roof + solar project work in Clairemont?

It starts with a layer count. We check how many coverings are on the deck and its condition, price roof and system from that, and return a proposal inside 48 hours. Both scopes are filed together with the City. Crews need 3–5 days on site; contract to Permission to Operate is 6–10 weeks.

01

Dual Assessment

We inspect your roof and energy needs in a single visit — roof condition, material options, and the solar layout the new roof should be built for.

02

Integrated Design

Roof and solar are engineered as one project, so mounting points, flashing, and weatherproofing are built into the roof itself.

03

Both Permits, One Contractor

A re-roof and a solar install are two separate permits in most San Diego jurisdictions — we hold C-39, C-46 and C-10, so one licensed company pulls both and sequences them under a single contract.

04

Roof Installation

Our in-house roofing crew installs the new roof with solar-ready mounting points and premium flashing.

05

Solar Installation

Immediately after the roof is done, our solar crew mounts and wires the array — no waiting weeks for a second company.

Where we install

Which Clairemont neighborhoods do we serve?

Five neighbourhoods, one building decade, and roof conditions that vary house by house after seventy years. Pick yours for the local picture.

Clairemont neighborhood

North Clairemont

Mid to late 1950s ranch homes. Layer count and deck condition are established before any combined quote is written.

Get a North Clairemont quote
Real Google reviews

What San Diego homeowners say

“San Diego Solar goes above and beyond to make sure a quality solar solution is installed — starting with the owner Dirk Hosmer, who personally oversees and works on my entire project.”

Brady Bishop

Google review · 2015

“It's been a great experience working with Dirk and Tonya. They are both extremely knowledgeable about solar energy and have always been quick to return a phone call or email. I would strongly recommend working with these guys.”

Dustin Brown

Google review · 2015

“Brad and Dirk are the kind of pros that make San Diego a great place. Friendly, know their craft well, not flashy. Went so well I worked with them to expand the original system later on.”

Brian K.

Google review · 2026

Questions, answered

Clairemont roofing + solar FAQ

Often not as it stands, but that is an answer rather than a refusal. The community was built out between 1950 and the mid-1950s, so most roofs have been re-covered at least once and a 25-year residential solar array needs ten to fifteen years of sound roof beneath it. We inspect layer count and deck condition free and tell you plainly which case your house is.

Only where code allows it: one existing layer, sound, dry and with no trapped moisture. A great many Clairemont roofs already carry two coverings after seventy years, which makes tear-off mandatory rather than optional. Our free inspection establishes the layer count before we recommend a path, so the answer is evidence rather than preference.

Not prescriptively, in most cases — this is a common misconception. The California Energy Commission places coastal San Diego, Clairemont included, in Title 24's Climate Zone 7, where the residential cool-roof prescription does not apply the way it does in inland Zone 10 cities like El Cajon and Escondido. Reflective membranes on flat sections remain a sensible choice, not a requirement.

That is usually where the project lives. This era's low-slope sections are frequently still on tar and gravel, which has to come off before anything is mounted. A welded TPO or PVC membrane runs roughly $10,000–$18,000 or $12,000–$21,000 per 1,500 sq ft, lasts 15 to 30 years, and gives the array a flat, watertight base to sit on.

It can, on the taller homes. The Clairemont Mesa Height Limit Overlay Zone in chapter 13, article 2, division 13 of the San Diego Municipal Code caps most structures at 30 feet, and a re-roof that adds build-up plus tilted racking eats into whatever margin is left. We calculate the finished height before submitting to Development Services.

City of San Diego Development Services, since Clairemont is a City of San Diego community rather than a separate city. We file the roof and the solar as one combined project under CSLB licence 970079, coordinate the inspections, and carry the SDG&E interconnection through to Permission to Operate. You never deal with the counter.

Sometimes, and it is better found during the assessment than mid-install. Original main panels from this era often lack the capacity or busbar rating a modern array and its interconnection need. Our licence carries the C-10 electrical classification alongside roofing and solar, so the panel work is quoted and performed by the same company, not subcontracted.

Typically $30,000–$60,000 before incentives for a Clairemont home, with one contractor across both trades running 15–20% below two separate companies and the prepaid lease taking another 30–40% off the solar portion. Crews are on site 3–5 days, and contract to Permission to Operate is 6–10 weeks including plan check and SDG&E interconnection.

Ready to Go Solar?

Get Your Free Custom Quote.

Save 30–40% with our prepaid lease program. These programs won't last forever.

30 YearsIn-House Crews5-Star Reviews