Skip to content
Fallbrook, CA

Roofing + Solar in
Fallbrook, CA

Forty-four square miles of unincorporated hill country, where fire history decides your roof before panels come up. Roofing and solar from one licensed company since 1996 — CSLB #970079 — with no travel surcharge.

30 Years Serving SD
100% In-House Crews
Save 30–40% Prepaid Lease
CSLB Lic #970079
5-Star Reviews
The short answer

Is Fallbrook a good place to re-roof and go solar together?

Yes, and the terrain writes half the specification. San Diego Solar handles roofing and solar as one project across Fallbrook on one licence — CSLB #970079 (C-39, C-10, C-46) — with in-house crews. Plans go to San Diego County, not a city, and much of Fallbrook is a very high fire hazard zone requiring a Class A roof and ember-resistant detailing. Free assessment, no travel surcharge.

By the numbers

Roofing + solar in Fallbrook, at a glance

0

Years Roofing + Solar

$0

Travel Surcharge

0

Yr Roof Workmanship Warranty

0

Weeks to Power-On (6–10)

Savings figures are estimates based on SDG&E rates and typical household usage. Actual savings vary by system size, roof, energy use, and future utility rate changes.

What’s different here

What’s special about roofing in Fallbrook?

Roof stock, permitting, and weather exposure differ street to street across San Diego County — and they decide both the right roofing material and the right solar mounting. Here’s how we approach Fallbrook specifically.

The Fire Map Sets the Roof Spec

The 2007 Rice Fire crossed I-15, forced Fallbrook's first full evacuation, burned nearly 10,000 acres and destroyed about 240 homes, per Cal Fire. On very high fire hazard parcels, chapter 7A of the California Building Code requires a Class A assembly and ember-resistant vents and edges. That comes first; appearance second.

County Permits, Not a City's

Fallbrook has no city hall. Every roof and every array here is permitted through San Diego County Planning and Development Services, which means a different submittal package and a different inspection route than the incorporated cities down the hill. We file both scopes as one combined County submission under CSLB licence 970079.

Big Roofs, Long Drives, One Mobilisation

Ranch homes on acreage, grove access roads and quarter-mile driveways make the logistics of a project as expensive as the materials. Bringing a tear-off crew, a roofing crew and a solar crew up the same drive once — instead of twice, a year apart — is where the 15–20% saving over two contractors actually comes from on a rural property.

Rural Does Not Mean a Surcharge

We run one office and travelling crews across San Diego County, and Fallbrook is quoted at the same rates as anywhere else — no distance loading. That crew is our own on both trades, so there is one combined warranty covering the roof and the array rather than two companies an hour apart pointing at each other.

Real numbers

How much does a new roof with solar cost in Fallbrook?

Rural roofs run larger, so grove properties sit in the upper half of the $30,000–$60,000 roof-and-solar range. One project saves 15–20% versus separate contractors; the prepaid lease cuts solar 30–40%. Flat sections run $7,000–$21,000 per 1,500 sq ft by membrane. A battery for well pumps adds $12,000–$16,000 per unit.

Modified bitumen

$7K–$12K

Value choice, welded seams

Typical installed range

$7,000–$12,000

TPOMOST COMMON

$10K–$18K

Most popular under solar

Typical installed range

$10,000–$18,000

PVC

$12K–$21K

Longest life, coastal-resistant

Typical installed range

$12,000–$21,000

Ranges are for a 1,500 sq ft low-slope area. A combined roof-and-solar project runs $30,000–$60,000 before incentives — about 15–20% under hiring a roofing company and a solar company separately. The prepaid lease takes a further 30–40% off the solar portion.

The five steps

How does a combined roof + solar project work in Fallbrook?

One site visit covers roof and energy use. Written proposal within 48 hours, one combined submission to San Diego County, the roof built with solar mounting flashed in, then the array. Crews need 3–5 days for a standard home. Contract to power-on runs 6–10 weeks, plan check and SDG&E interconnection included.

01

Dual Assessment

We inspect your roof and energy needs in a single visit — roof condition, material options, and the solar layout the new roof should be built for.

02

Integrated Design

Roof and solar are engineered as one project, so mounting points, flashing, and weatherproofing are built into the roof itself.

03

Both Permits, One Contractor

A re-roof and a solar install are two separate permits in most San Diego jurisdictions — we hold C-39, C-46 and C-10, so one licensed company pulls both and sequences them under a single contract.

04

Roof Installation

Our in-house roofing crew installs the new roof with solar-ready mounting points and premium flashing.

05

Solar Installation

Immediately after the roof is done, our solar crew mounts and wires the array — no waiting weeks for a second company.

Where we install

Which Fallbrook neighborhoods do we serve?

Grove country, ridge lots and the village core — different access, different exposure, one County counter. Pick an area for the local picture.

Fallbrook neighborhood

Downtown Fallbrook

Older village-core homes on smaller lots, many with low-slope rear sections that lead the roofing scope.

Get a Downtown Fallbrook quote
Real Google reviews

What San Diego homeowners say

“We love our solar electricity! Dirk and Brad explained all of our options. They took the time to examine several options and help us design a system that was perfect for us.”

Ione Stiegler

Google review · 2016

“San Diego Solar installed solar panels on my residence. The service was fantastic. The owner Dirk first determined how many panels I needed by reviewing my past electric bills. He then provided a simple, straightforward quote.”

Dan Navigato

Google review · 2016

“San Diego Solar goes above and beyond to make sure a quality solar solution is installed — starting with the owner Dirk Hosmer, who personally oversees and works on my entire project.”

Brady Bishop

Google review · 2015

Questions, answered

Fallbrook roofing + solar FAQ

Much of the community is mapped that way, and your parcel's status is checked before we specify anything. Where it applies, chapter 7A of the California Building Code requires a Class A roof assembly along with ember-resistant vents and edge detailing. That shapes material choice, and it applies to the roof regardless of whether solar is part of the project.

San Diego County Planning and Development Services, because Fallbrook is unincorporated rather than a city. The submittal package and inspection routing differ from the incorporated cities, which is one of the more common places rural projects stall. We file the roof and array as a single combined County submission and manage the inspections.

No. We run one office with crews that travel across San Diego County, and there is no distance loading on a Fallbrook quote — the same rates apply as in the coastal cities. Access does affect the logistics plan, which is why we look at the driveway and staging space during the free on-site assessment.

Something Class A and low-maintenance, because the property already gives you plenty to maintain. Concrete and clay tile, standing seam metal and Class A rated composition assemblies all qualify, and welded membranes cover flat sections on outbuildings. Manufacturer warranties typically run 25 to 50 years, which lets us match the roof to the 25-year array above it.

A typical home lands in the $30,000–$60,000 band before incentives, with larger grove-property roofs toward the upper end on area alone. Doing both trades as one project saves 15–20% against separate contractors, and the prepaid lease takes 30–40% off the solar portion. The federal tax credit is not available; it ended on 31 December 2025.

It changes what the battery has to carry. A well pump is a meaningful load and usually the first thing a rural household wants running through an outage, so we size storage around the appliances you actually need rather than a generic backup figure. Installed, a home battery unit is $12,000–$16,000, and rural properties more often want two than one.

If the roof does not have ten to fifteen years of life left under a 25-year array, yes. Reversing the order later costs roughly $2,800–$4,800 to remove and reset the panels, before any roofing work — and on a rural property it also means a second mobilisation up the same drive. We give you a straight verdict at the assessment.

Three to five days for a standard home, longer where roof areas are large or access is tight. The full timeline from contract to Permission to Operate is 6–10 weeks, most of it County plan check, materials and SDG&E interconnection rather than work on your property. Your written proposal arrives within 48 hours of the visit.

Ready to Go Solar?

Get Your Free Custom Quote.

Save 30–40% with our prepaid lease program. These programs won't last forever.

30 YearsIn-House Crews5-Star Reviews