Skip to content
Del Mar, CA

Roofing + Solar in
Del Mar, CA

Every Del Mar sale runs through an inspection report, and an ageing roof under a young array is the line item that gets negotiated against you. 50+ Del Mar projects delivered as one asset — roof and solar engineered together, CSLB #970079, one warranty.

30 Years Serving SD
100% In-House Crews
Save 30–40% Prepaid Lease
CSLB Lic #970079
5-Star Reviews
The short answer

Is Del Mar a good place to re-roof and go solar together?

Yes, and resale usually settles it. Buyers in 92014 bring an inspector, and an ageing roof discounts the house whatever the array produces. Lawrence Berkeley National Laboratory puts the buyer premium for owned solar at roughly four dollars per watt — only on a sound roof. San Diego Solar has completed 50+ Del Mar projects as one asset: in-house crews, CSLB #970079, one warranty across roof and solar. Free assessment: (619) 514-0095.

By the numbers

Roofing + solar in Del Mar, at a glance

0+

Del Mar Projects

0

Sunny Days / Year

0

Years in San Diego

0

Yr Workmanship Warranty

Savings figures are estimates based on SDG&E rates and typical household usage. Actual savings vary by system size, roof, energy use, and future utility rate changes.

What’s different here

What’s special about roofing in Del Mar?

Roof stock, permitting, and weather exposure differ street to street across San Diego County — and they decide both the right roofing material and the right solar mounting. Here’s how we approach Del Mar specifically.

One Fix, Two Findings

Roof condition and solar age are separate entries in a buyer's report, and they interact badly. An eight-year-old array on a twenty-two-year-old roof reads to a buyer as a future bill with panels attached to it. Replacing the roof and setting the array into it puts both on one date, with documentation a listing agent can actually use.

Design Review and the Class A Rule

Del Mar's Design Review Board is a seven-member citizen committee that assesses projects against the Design Review Ordinance in Chapter 23.08 of the municipal code, and proposals that change a roof plane usually require review. Del Mar also requires roof coverings to be Class A rated, fire-retardant and non-wood. We design to both before anything is ordered.

Marine-Grade From the Sand Upward

Beach Colony and the bluff parcels sit in genuinely corrosive air, and corrosion is what turns a thirty-year roof into a nineteen-year roof. Corrosion-rated flashing, fasteners and racking are standard on our coastal work in Del Mar at no premium, which is the difference between a system that ages to its rating and one that ages to the coast's schedule.

Conventional Plan Review, Carried by Us

Unlike several neighbouring cities, Del Mar runs conventional plan review rather than instant online permitting, and its certified Local Coastal Program means bluff-adjacent or visually sensitive parcels can additionally require a Coastal Development Permit. We have worked Del Mar's process for years and carry every submission, including SDG&E interconnection.

Real numbers

How much does a new roof with solar cost in Del Mar?

A combined re-roof and solar project in Del Mar typically runs $30,000–$60,000 before incentives, about 15–20% below two separate firms. Low-slope areas in Beach Colony and on the bluffs run $7,000–$21,000 per 1,500 sq ft depending on membrane. Marine-grade hardware is included; the prepaid lease cuts the solar portion 30–40%.

Modified bitumen

$7K–$12K

Value choice, welded seams

Typical installed range

$7,000–$12,000

TPOMOST COMMON

$10K–$18K

Most popular under solar

Typical installed range

$10,000–$18,000

PVC

$12K–$21K

Longest life, coastal-resistant

Typical installed range

$12,000–$21,000

Ranges are for a 1,500 sq ft low-slope area. A combined roof-and-solar project runs $30,000–$60,000 before incentives — about 15–20% under hiring a roofing company and a solar company separately. The prepaid lease takes a further 30–40% off the solar portion.

The five steps

How does a combined roof + solar project work in Del Mar?

Five tracked stages under Del Mar's conventional plan review, plus a Coastal Development Permit on bluff-adjacent parcels and design review where a roof plane changes. The roof goes on first with mounting integrated, then the array. Most projects take 6–10 weeks with 3–5 days on site; we flag longer bluff timelines at proposal.

01

Dual Assessment

We inspect your roof and energy needs in a single visit — roof condition, material options, and the solar layout the new roof should be built for.

02

Integrated Design

Roof and solar are engineered as one project, so mounting points, flashing, and weatherproofing are built into the roof itself.

03

Both Permits, One Contractor

A re-roof and a solar install are two separate permits in most San Diego jurisdictions — we hold C-39, C-46 and C-10, so one licensed company pulls both and sequences them under a single contract.

04

Roof Installation

Our in-house roofing crew installs the new roof with solar-ready mounting points and premium flashing.

05

Solar Installation

Immediately after the roof is done, our solar crew mounts and wires the array — no waiting weeks for a second company.

Where we install

Which Del Mar neighborhoods do we serve?

Del Mar covers less than two square miles and still changes character three times between the sand and the mesa. What that means per pocket:

Del Mar neighborhood

Olde Del Mar

Village-adjacent homes with mixed and often older roof stock. Structural evaluation and design review expectations both come before an array layout.

Get a Olde Del Mar quote
Real Google reviews

What San Diego homeowners say

“San Diego Solar installed solar panels on my residence. The service was fantastic. The owner Dirk first determined how many panels I needed by reviewing my past electric bills. He then provided a simple, straightforward quote.”

Dan Navigato

Google review · 2016

“San Diego Solar goes above and beyond to make sure a quality solar solution is installed — starting with the owner Dirk Hosmer, who personally oversees and works on my entire project.”

Brady Bishop

Google review · 2015

“It's been a great experience working with Dirk and Tonya. They are both extremely knowledgeable about solar energy and have always been quick to return a phone call or email. I would strongly recommend working with these guys.”

Dustin Brown

Google review · 2015

Questions, answered

Del Mar roofing + solar FAQ

Both sides help, in different ways. Lawrence Berkeley National Laboratory's analysis of home sales found buyers pay roughly four dollars per watt for an owned solar system, and a roof with documented remaining life removes the credit a buyer would otherwise demand. Pairing them means the listing shows one recent date for the whole roof assembly rather than two competing ages.

It depends on what changes. Straight replacement in kind is usually a building matter, but proposals that alter a roof plane, pitch or profile typically go to design review under Chapter 23.08 of the Del Mar municipal code, assessed by a seven-member citizen board. We flag which category your project falls into during the assessment, not after submittal.

Del Mar requires roof coverings to be Class A rated, fire-retardant and non-wood, which rules out untreated wood shake and shingle. That still leaves concrete and clay tile, Class A composition shingle, standing seam metal and welded low-slope membranes, all of which we install in-house and all of which carry manufacturer warranties.

Most standard projects do not. Del Mar operates under a certified Local Coastal Program, and bluff-adjacent or visually sensitive parcels can require a Coastal Development Permit in addition to City review. Del Mar also uses conventional plan review rather than instant online permitting, so the timeline differs from neighbouring cities. We manage both paths.

Most fall between $30,000 and $60,000 before incentives, about 15 to 20 percent below two separate contracts for the same scope. Marine-grade hardware on coastal addresses is included at no premium, and the prepaid lease removes 30 to 40 percent from the solar portion. We quote precisely after a free on-roof assessment rather than from square footage alone.

It changes components rather than design. Flashing, fasteners, vents and mounting hardware corrode early this close to the water, so coastal re-roofs get corrosion-rated equivalents throughout. Doing that during a re-roof is the correct moment, because the protection goes in at deck level across the whole assembly instead of being bolted onto an existing roof.

On-site work runs 3 to 5 days, roof first with the array following on the new surface. Contract to power-on typically takes 6 to 10 weeks covering City plan review, materials, inspections and SDG&E interconnection. Bluff parcels requiring a Coastal Development Permit can run longer, which we identify at proposal so the sale or move-in date is planned around reality.

Yes, and it is worth deciding deliberately. Berkeley Lab's resale premium applies to owned residential solar systems; a lease transfers as an agreement the buyer has to accept. Our prepaid lease lowers upfront cost by 30 to 40 percent on the solar portion, which suits some owners and not others. We walk the trade-off against how long you plan to hold the house.

Ready to Go Solar?

Get Your Free Custom Quote.

Save 30–40% with our prepaid lease program. These programs won't last forever.

30 YearsIn-House Crews5-Star Reviews